From Thursday 01.04.2027 to Friday 21.05.2027
Section affected
Montreux - Glion - Haute-de-Caux - Rochers-de-Naye
Replacement service and general information
- No train operates between Montreux and Rochers-de-Naye.
- All trains between Montreux and Haut-de-Caux are replaced by buses. Please consult the online timetable before your departure.
- For Valmont (Clinic) a replacement bus will depart from Glion. Please consult the online timetable before your departure.
- The stop Glion-Alpes will not be served during the entire period of the works.
- The Glion-Territet funicular will run according to the usual timetable.
- Connections in Montreux and Glion (funicular) are not guaranteed and delays are to be expected.
Noise
- The construction work requires night-time work. We will endeavour to keep noise to a minimum and apologise for any inconvenience caused.
Projet Naye 2042
- MVR SA is undertaking a major transformation of the Montreux–Les Rochers-de-Naye line.
- The works are part of the Naye 2042 project: by 2029, new panoramic trains, modernised infrastructure and a redesigned summit site.
- For more information about the project, please visit the Naye 2042 website.
Timetables and additional information
- The online timetable has been updated.
- Please check the timetable online before each journey: www.cff.ch/horaire or www.mob.ch/horaire
- Groups of 10 or more are requested to contact goldenpass@mob.ch
- MOB RailCenter: https://mob.ch/contact
- This situation does not entitle to a refund.
- All information is currently provided for guidance only and is subject to change.
We apologise for any inconvenience caused and thank you for your understanding.